Energex Substation | Gatton

Category
Infrastructure
About This Project

Stormwater runoff was a major design focus for this substation west of Brisbane. Gravel lined overland flow paths were configured into the landscape to capture and re-direct runoff around the substation to available stormwater collection points within the site.